Project

Alto Rabagao

Montalegre, Portugal

Photovoltaic solar

Alto Rabagao (Portugal)

This floating solar plant of 218 kWp is installed on a hydroelectric dam, located in Montalegre, Portugal.

The Hydrelio® floating solar system supports 840 panels (260 Wp REC modules), and covers about 0.01 % of the water surface (0.26 out of 2212 ha).

For this project, Ciel & Terre operated as EPC (Engineering Procurement and Construction). We were in charge of Hydrelio® supply, the design and construction of solar island, anchoring and electrical systems. The bottom anchoring with percussive driven earth anchors was designed to meet a maximum depth of 90.0 m and a level variation of 30.0 m.

The grid connection was effective in November 2016.

Project activities

Main company

Ciel & Terre International

Activities

Equipment manufacturer, Developer of energy production plants

Project Information
Detail of the equipment used

Hydrelio floats®

Installed power (specify unit KW, MW or other)

220 kWp

Annual produced energy (specify unit MWh or other)

332 MWh

Grid connection

On grid

Project cost (in euros)

400 000 €

Year of entry into service

2016

Project progress

Contract signed
Work in progress
In operation
Employees mobilized
  • 15

    Locals employees

  • 7

    Employees for the development phase

  • 3

    Employees for the construction phase

  • 3

    Employees for maintenance

Main company

Ciel & Terre International

  • Photovoltaic solar
  • Equipment manufacturer , Developer of energy production plants , Operation and maintenance