Project

Project 1224 - Beni

Beni, Democratic Republic of Congo

Hydropower | Access to energy

r614_9_1224_hpp_rdc-2.jpg

Design, manufacturing, installation and commissioning of 2 Pelton turbines of 8 MW each and their electrical  equipment (water to wire project).

Project activities

Main company

HPP

Activities

Equipment manufacturer

Project Information
Detail of the equipment used

Inlet Valve, Turbine, Generator, HPU, High voltage breaker, Transformers, automation systems & electrical equipment, control panel

Installed power (specify unit KW, MW or other)

8 MW

Annual produced energy (specify unit MWh or other)

15 000

Grid connection

Off grid

Project cost (in euros)

Nc

Project progress

Contract signed
Work in progress
In operation
Employees mobilized
  • -

    Locals employees

  • -

    Employees for the development phase

  • -

    Employees for the construction phase

  • -

    Employees for maintenance

Main company

HPP

  • Hydropower , Access to energy
  • Equipment manufacturer
Share
EN FR
Legal Notice - Copyright 2020